What It Is

The Cluster Investment Platform (KIP) is a mechanism for financing investment projects aimed at producing priority products, at a preferential interest rate, by reimbursing banks for foregone income on loans. This allows the investor to obtain “long” financing for the construction or modernization of production facilities at a rate significantly below market.

The regulatory basis is Government of the Russian Federation Resolution No. 295 dated 22.02.2023, as well as Decision No. 24-64132-01596-R of the Ministry of Industry and Trade of Russia dated 23.03.2026 on the procedure for granting the subsidy. The program operator is the Industrial Development Fund (FRP), which conducts the project appraisal, support and monitoring.

Key Parameters

₽2–100 billion
Loan amount (for projects producing medicines and medical devices — ₽1–100 billion)
investment phase + 2 years
Duration of the preferential rate
from 20%
Minimum share of the investor’s own contribution to the project cost

How the Preferential Rate Is Determined

The rate is tied to the Bank of Russia key rate (CBR key rate). Examples are given assuming a CBR key rate of 14%. The applicable formula depends on the date the borrower receives satisfactory indicative terms from the bank.

Preferential Loan Rate for the Borrower

0.3 × key rate + 3%
Indicative terms received before 31.03.2026 (at a key rate of 14%, the rate would be 7.2%)
no more than 7% + (key rate − 10%)
Indicative terms received on or after 31.03.2026: if the key rate is above 10% — no more than 7% plus the difference between the key rate and 10%; if the key rate is 10% or below — no more than 7% (at a key rate of 14%, the rate would be 11%)

Subsidy to the Bank to Compensate for Foregone Income

0.9 × key rate
Indicative terms provided by the bank before 31.03.2026 (at a key rate of 14% — 12.6%)
8% / key rate − 2%
Indicative terms provided by the bank on or after 31.03.2026: if the key rate is above 10% — 8%; if the key rate is 10% or below — the key rate minus 2 percentage points

What the Funds Can Be Used For

  • creation and acquisition of fixed assets;
  • development of design documentation;
  • research and development (R&D) work;
  • construction, major repairs or reconstruction of industrial buildings and structures;
  • creation and reconstruction of industrial infrastructure;
  • launching production, commissioning industrial infrastructure facilities, and manufacturing priority products — purchasing consumables, raw materials and components (no more than 20% of the loan amount);
  • acquiring or leasing land plots for new production facilities;
  • leasing buildings, structures, premises and equipment;
  • maintenance and upkeep of fixed assets;
  • repaying loans provided by the Industrial Development Fund;
  • purchasing Russian software.

Important condition: the project’s products must be included in the list of priority products, which is approved by an interdepartmental commission of the Ministry of Industry and Trade of Russia based on industry import substitution plans and the list of critical products, components and raw materials.

Key Sectors of Application

Heavy, Oil and Gas, Power, and Transport Machinery
Automotive and Shipbuilding Industry, Marine Equipment
Civil Aircraft Manufacturing
Construction, Road, Utility and Airfield Equipment
Machine Tool Industry
Agricultural Machinery and Forestry Complex
Chemical Industry and Bioengineering Technologies
Machinery for the Food Industry
Ferrous and Non-Ferrous Metallurgy
Light Industry
Pharmaceutical and Medical Industry
Industry for Socially Significant Goods
Conventional Weapons, Ammunition and Special Chemicals Industry
Cable, Electrical and Electronics Industry
Construction Materials Industry
Environmental Machinery and Waste Management
Sports Industry

Who Is Eligible

The borrower must be a Russian legal entity that is the initiator of a project to manufacture priority products (not a group of companies on a consolidated basis). Mandatory requirements: the borrower is established under Russian law, has Russian tax resident status, and conducts operating activities within Russia.

Support is not provided if the direct or indirect participation of offshore companies in the borrower’s charter capital exceeds 50%.

How to Obtain the Benefit

  • confirm that the project’s products are included in the list of priority products (if not, initiate their inclusion through the relevant industry department of the Ministry of Industry and Trade of Russia);
  • submit a financing application to a credit institution or VEB.RF and obtain indicative terms (rate calculation, financing structure and form — loan, credit line, syndicated loan);
  • submit the documents and the indicative terms obtained to the Industrial Development Fund for a comprehensive project appraisal, ensuring an own contribution of at least 20% of the project cost;
  • obtain the FRP’s opinion on whether the project can be included in the list (or on the need for revision);
  • obtain a decision from the Interdepartmental Commission on Preferential Lending (IDC) to include the project in the list — the application and the FRP’s opinion are reviewed by the Ministry of Industry and Trade of Russia, with the decision made by the IDC;
  • after the Ministry of Industry and Trade of Russia approves the list of projects, conclude a loan agreement at the subsidized rate — no later than 6 months from the date the list is approved.

Project selection is conducted by the Ministry of Industry and Trade of Russia during announced selection rounds via GISP; the borrower subsequently reports on project implementation via GISP at least once every 6 months.

Restriction on combining measures: a preferential KIP loan and an FRP loan cannot both be obtained for the same project if they are aimed at financing the same project or manufacturing the same priority product.

Monitoring and Consequences of Non-Compliance

Each year (by February 15 and August 15), the borrower submits reporting to the FRP via GISP: confirmation that project milestones have been reached and data on the project’s results — the volume of products manufactured in physical terms.

If the borrower fails to meet the project’s milestones (on a cumulative basis) within 12 months, the subsidy payment to the bank is suspended and the borrower’s preferential rate is recalculated as a commercial rate. For projects approved for inclusion in the list before 31.03.2026, this condition applies if more than 30% of the project’s milestones (on a cumulative basis) are not met within 12 months.

Impact of the Instrument

For investors — access to “long” financing for a large, capital-intensive project at a rate significantly below market, with protection against increases in the key rate through the budget subsidy.

For the economy — the launch of domestic production replacing critical imports, and the localization of component and raw material manufacturing.

Documents

Government of the Russian Federation Resolution No. 295 dated 22.02.2023
“On State Support for Organizations Implementing Investment Projects Aimed at Manufacturing Priority Products” — the basic conditions and procedure for granting the subsidy
Decision No. 24-64132-01596-R of the Ministry of Industry and Trade of Russia dated 23.03.2026
Procedure for granting the subsidy under the Cluster Investment Platform

Электронный офис клиента в разработке

Закрыть
Write a letter
The following required fields are missing: Your name
The following required fields are missing: Your e-mail
The following required fields are missing: Your message
The following required fields are missing: CAPTCHA
Your message has been sent.
Leave feedback

It is important for us to know your opinion about the bank in order to make our work even better.

The following required fields are missing: Your name
The following required fields are missing: Your company
The following required fields are missing: Your e-mail
The following required fields are missing: Your message
The following required fields are missing: CAPTCHA
Your message has been sent.
Reporting corruption
The following required fields are missing: Your name
The following required fields are missing: Your e-mail
The following required fields are missing: Your phone
The following required fields are missing: Your message
Your message has been sent.